Advance construction method - List of Manufacturers, Suppliers, Companies and Products

Advance construction method Product List

1~4 item / All 4 items

Displayed results

Small Diameter Pipe Underground Installation Work "Top Mall Method"

The "Top Mall Method" allows for extensive underground excavation without digging, enabling the installation of various communication cables, gas pipes, and plumbing for water supply and drainage. It also shortens construction time!

The Top Mall Method (Small Diameter Boring Method) is a non-excavation construction method for the installation of buried pipelines using a drill boring machine. It is suitable for construction in locations where excavation is difficult, such as national roads and railway tracks, and is a clean and simple boring method that does not produce excavated soil due to its non-excavation nature. Additionally, it is equipped with a directional correction boring method. 【Features】 ■ Boring Direction Correction Function: Curved boring is possible (Type M primarily focuses on straight boring) ■ Detection of Leading Drill Head: Can recognize angles, ensuring high safety and reliability ■ Compaction Method: No ground subsidence occurs due to the non-excavation method ■ Short Construction Period: Approximately 30m to 50m per day per location, depending on soil type, pipe size, and working environment ■ No significant traffic disruption, allowing for daytime construction ■ Environmentally friendly clean method that does not produce industrial waste due to the absence of excavation *For more details, please download the PDF or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HDD method (guided horizontal drilling) achieves shortened construction time and labor savings!

Piping and wiring burial system (non-excavation and thrust method)! Numerous achievements! Also attracting attention for "overhead line removal"! "Challenging the creation of lifelines that traverse the Earth and underground."

With the acceleration and advancement of urban functions, the development of various lifelines such as water supply and drainage, electricity, gas, and communications is becoming increasingly important. The HDD method (Horizontal Directional Drilling) / TerraJet is a construction method for burying pipes and cables using non-excavation techniques, which reduces traffic disruption and soil disposal issues. It allows for clean and highly safe construction by detecting the construction position from above ground while drilling. In recent years, the shortage of skilled labor and the rising costs of facility maintenance and repairs have become social issues. From the perspective of shortening construction periods and reducing total costs, the HDD method / TerraJet is gaining attention as a method for burying water supply and drainage pipes, gas pipes, and power cables underground. In Europe and the United States, this method is known as NO-DIG, Trenchless, HDD (Horizontal Directional Drilling), no-dig, trenchless, and horizontal directional drilling. 【Features】 - Flexibility and adaptability - Shortened construction period - Economically low cost - Harmony with the natural environment - Safety For more details, please contact us or download the catalog.

  • Rock drills, demolition machines, and excavators
  • Civil Engineering Method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping construction: "Top Mall Method" for non-excavation installation of pipelines! Construction case study.

We will excavate underground extensively without open-cutting and install communication cables, gas pipes, and pipes for water supply and drainage.

The Top Mall Method (Small Diameter Boring Method) is a non-excavation construction method for the installation of buried pipelines using a drill boring machine. It is suitable for construction in locations where excavation is difficult, such as national roads and railway tracks, and being a non-excavation method, it is a clean and simple boring method that does not produce spoil. Additionally, it is equipped with a directional correction boring method. 【Features】 ■ Boring Direction Correction Function: Curved boring is possible (Type M mainly performs straight boring) ■ Detection of the Leading Drill Head: Recognizes angles and other parameters, ensuring high safety and reliability ■ Compaction Method: No ground subsidence occurs due to being a no-spoil method ■ Short Construction Period: Approximately 30m to 50m per day per location, depending on soil type, pipe size, and working environment ■ No significant traffic disruption, allowing for daytime construction ■ Environmentally friendly clean method that does not produce industrial waste due to the lack of excavation *For more details, please download the PDF or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HDD Method (Guided Horizontal Drilling) / TerraJet: Solving Open-Cut Problems

Piping and wiring burial system! Numerous achievements! Capable of handling conditions that are "difficult to construct using open-cut methods"! "Challenging the creation of lifelines that traverse the Earth and underground."

With the acceleration and advancement of urban functions, the development of various lifelines such as water supply and drainage, electricity, gas, and communication has become increasingly important. The HDD method (Horizontal Directional Drilling) / TerraJet is a construction method for burying pipes and cables using non-excavation techniques, which reduces traffic disruption and soil disposal issues. It allows for clean and safe construction by detecting the construction position from above ground while advancing. In recent years, there has been a demand for consideration of neighboring residents and responses to traffic congestion, leading to the HDD method / TerraJet gaining attention as a technique for burying water supply and drainage pipes, gas pipes, and electric cables underground under conditions where traditional excavation methods are difficult. In Europe and the United States, this method is known as NO-DIG, Trenchless, HDD (Horizontal Directional Drilling), No-Dig, Trenchless, and Horizontal Directional Drilling. 【Features】 - Flexibility and adaptability - Shortened construction period - Economically low cost - Harmony with the natural environment - Safety For more details, please contact us or download the catalog.

  • Water Supply Facilities
  • Special Construction Method
  • Pipeline Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration